Case Histories
Learn more about the reliable solutions from the most trusted helical brand in the market.

CHALLENGE:Horizontal-Line-Yellow

Design a classroom building with a basement against an existing building without a basement. Provide vertical support to the existing structure and earth support under the footing of the new sub-grade.

North-Main-Baptist-Case-Study-Button

CHALLENGE:Horizontal-Line-Yellow

A 1940s era training academy, built on undocumented fill, needs renovations including foundation underpinning and straightening of the building in a limited-access area. Meticulous testing required throughout the project.

BC-Academy-Case-Study-Button